参考文献/References:
[1]汪旭光.爆破设计与施工[M].北京:冶金工业出版社,2015.
[2]汪旭光.爆破手册[M]. 北京:冶金工业出版社.2010.
WANG X G.Handbook of blasting[M].Beijing:Metallurgical Industry Press,2010.
[3]李鸿飞,应海剑,郑飞,等.爆破拆除簿壁钢筋混凝土烟囱[J].西部探矿工程,2010(12):196-198.
[4]爆破安全规程:GB6722—2014[S].北京:中国标准出版社,2014.
Safety regulations for blasting:GB6722—2014[S].Beijing:China Standard Press,2014.
[5]刘殿书,李胜林.爆破工程[M].北京:科学出版社,2011.
LIU D S,LI S L.Blasting engineering[M].Beijing:Science Press,2011.
[6]王永庆,高荫桐,张春生,等.冷却塔拆除爆破失稳数值分析[J].有色金属(矿山部分),2008,60(1):38-40,47.
WANG Y Q, GAO Y T, ZHANG C S, et al.Numerical analysis on instability of cooling tower in demolition blasting[J].Nonferrous Metals (Mining Section), 2008,60(1):38-40,47.
[7]王健.高耸烟囱爆破拆除安全性的力学分析[D].唐山:河北理工大学,2005.
WANG J.Mechanics analysis on safety of demolition of tall chemneys by controlled blasting [D].Tangshan:Hebei Polytechnic University,2005.
[8]齐世福,刘好全,李宾利,等.框剪结构高楼纵向倾倒拆除爆破研究[J].爆破器材,2014,43(3):41-47.
QI S F, LIU H Q, LI B L,et al.Blasting study on the lengthwise collapse of a tall building with a frame shear wall structure[J].Explosive Materials,2014,43(3):41-47.
[9]周应军,陈德志,李本伟,等.复杂环境下75 m高冷却塔爆破拆除[J].爆破器材,2013,42(3):53-56.
ZHOU Y J,CHEN D Z, LI B W, et al.Blasting demolition of 75 m high cooling tower in complicated environment [J].Explosive Materials,2013,42(3): 53-56.
[10]夏卫国,袁平,武双章,等.复杂环境下两座烟囱交叉定向爆破拆除[J].爆破器材,2015,44(1):50-54.
XIA W G, YUAN P, WU S Z,et al.Crossed directional blasting of two chimneys under complex surroundings[J].Explosive Materials,2015, 44(1):50-54.
[11]李本伟,陈德志,张萍,等. 180 m高钢筋混凝土烟囱爆破拆除[J].爆破,2011,28(4):57-60,68.
LI B W,CHEN D Z,ZHANG P, et al. Demolition of a 180-meter superheight reinforced concrete chimney by directional blasting [J].Blasting,2011,28(4):57-60,68.
[12]梁锐,刘国军.复杂环境下9层框架楼房切割定向爆破拆除[J].爆破,2012,29(2):80-83.
LIANG R, LIU G J. Cutting directional demolition blasting of a 9-layer concrete building under complicated situation[J].Blasting,2012,29(2):80-83.
[13]李新翰,栾龙发,张智宇,等. 45 m高砖烟囱控制爆破拆除[J]. 工程爆破,2014,20(4):23-26.
LI X H,LUAN L F,ZHANG Z Y,et al. Demolition of 45 m brick chimney by controlled blasting technology[J]. Engineering Blasting,2014,20(4):23-26.
[14]何国敏. 复杂环境下180 m烟囱定向控制爆破拆除[J].爆破,2011,28(3):74-76,100.
HE G M. Directional controlled explosive demolition of 180 m high chimney in complex conditions [J]. Blasting,2011,28(3):74-76,100.
[15]闫鸿浩,刘智远,李晓杰.烟囱爆破拆除及其振动测试分析[J].爆破器材,2013,42(3): 21-24.
YAN H H, LIU Z Y, LI X J.Chimney blasting demolition and analysis of vibration measurement [J].Explosive Materials,2013,42(3): 21-24.
[16]汪旭光.中国典型爆破工程与技术[M].北京:冶金工业出版社,2006.
[17]于亚伦.工程爆破理论与技术[M].北京:冶金工业出版社,2004.
相似文献/References:
[1]齐世福,王福刚,薛峰松,等.180m高钢筋混凝土烟囱爆破拆除[J].爆破器材,2010,39(01):26.
QI Shifu,WANG Fugang,XUE Fengsong,et al.Demolition of a 180m-superheight Reinforced Concrete Chimney by Directional Blasting[J].EXPLOSIVE MATERIALS,2010,39(06):26.
[2]夏卫国,史长猛,武双章,等.谏壁电厂三座100m高钢筋混凝土烟囱爆破拆除[J].爆破器材,2011,40(02):36.
XIA Weiguo,SHI Changmeng,WU Shuangzhang,et al.Demolition of the Three 100 mhigh Reinforced Concrete Chimneys of Jianbi Power Plant by Directional Blasting[J].EXPLOSIVE MATERIALS,2011,40(06):36.
[3]武双章,夏卫国,王德荣,等.2座150 m高钢筋混凝土烟囱爆破拆除应变分析[J].爆破器材,2011,40(06):37.
WU Shuangzhang,XIA Weiguo,WANG Derong,et al.Strain Analysis in Blasting Demolition of Two 150 mhigh Reinforced Concrete Chimneys[J].EXPLOSIVE MATERIALS,2011,40(06):37.
[4]郑建礼,姜宝金,胡光球,等.全剪力墙结构楼房的定向爆破拆除[J].爆破器材,2018,47(03):55.[doi:10.3969/j.issn.1001-8352.2018.03.011]
ZHENG Jianli,JIANG Baojin,HU Guangqiu,et al.Blasting Demolition of a Building with Full Shear Wall Structure[J].EXPLOSIVE MATERIALS,2018,47(06):55.[doi:10.3969/j.issn.1001-8352.2018.03.011]