[1]范龙泉①,李小帅②,李杜一③,等.毫秒微差爆破在高层楼房拆除中的应用与研究[J].爆破器材,2018,47(05):54-58,64.[doi:10.3969/j.issn.1001-8352.2018.05.010]
 FAN Longquan,LI Xiaoshuai,LI Duyi,et al.Application and Study of Millisecond Delay Blasting Technology in High-rise Building Demolition Blasting[J].EXPLOSIVE MATERIALS,2018,47(05):54-58,64.[doi:10.3969/j.issn.1001-8352.2018.05.010]
点击复制

毫秒微差爆破在高层楼房拆除中的应用与研究()
分享到:

《爆破器材》[ISSN:1001-8352/CN:32-1163/TJ]

卷:
47
期数:
2018年05
页码:
54-58,64
栏目:
爆破技术
出版日期:
2018-09-27

文章信息/Info

Title:
Application and Study of Millisecond Delay Blasting Technology in High-rise Building Demolition Blasting
文章编号:
5253
作者:
范龙泉李小帅李杜一徐振洋
①中冶沈勘建筑工程有限公司(辽宁沈阳,110016)
②辽宁科技大学矿业工程学院(辽宁鞍山,114051)
③中铁上海设计院集团有限公司(上海,200070)
Author(s):
FAN Longquan LI Xiaoshuai LI DuyiXU Zhenyang
① Shenkan Engineering & Technology Corporation, MCC (Liaoning Shenyang, 110016) 
② School of Mining Engineering, Liaoning University of Science and Technology (Liaoning Anshan, 114051)
③ China Railway Shanghai Design Institute Group Co., Ltd. (Shanghai, 200070)
关键词:
前冲后坐爆破持续时间毫秒微差爆破支撑体
Keywords:
moving-up backward collapse blasting duration millisecond delay blasting support body
分类号:
TU746.5
DOI:
10.3969/j.issn.1001-8352.2018.05.010
文献标志码:
A
摘要:
通过对高层建筑物倒塌过程中的后坐和前冲运动的分析论述,阐明了毫秒微差爆破持续时间对运动过程的影响;介绍了毫秒微差爆破技术在18层框架结构楼房拆除中的应用情况。为减少建筑物在拆除爆破中对周边环境的影响,设计合理的爆破网路参数,并且对主楼、墙体、剪力墙等结构进行预处理;采用适当的分段延时方法使得振动叠加,控制建筑物倒塌范围,从而减少高层楼房塌落产生的危害。合理的分段时间增加了建筑结构体内力作用时间,保证了楼房的充分解体,达到了预期的爆破拆除效果。
Abstract:
By analysis and discussion of the motion of the collapse process of high-rise building, the influence of blasting duration in millisecond delay blasting on the movement process was clarified. Application of millisecond delay blasting in an 18-story frame structure building was introduced. To reduce the environmental impact of the building in explosive demolition, suitable parameters for blasting network were designed. The main building, the walls and shear walls were pre-treated. An appropriate piece-wise delay method was used to make the vibration superimposed and control the collapsing range of the building, and thus to minimize the harm of blast. Reasonable time interval increased the action time of internal force of the building and ensured the full collapse of building, so as to achieve the desired blasting outcome.

参考文献/References:

[1]PARK H,SUK C G,CHOI S H,et al.Relations between the explosive demolition design variables and progressive collapse resisting capacity of RC frame structures[J].Science and Technology of Energetic Materials:Journal of the Japan Explosive Society,2014,75(5/6):119-127.
[2]PARK H, PARK H K, KO J H, et al. Blast design for explosive demolition of a large-scale concrete foundation [J]. Science and Technology of Energetic Materials:Journal of the Japan Explosive Society, 2013,74(1/2):6-11.
[3]杨阳,杨仁树,李清,等.复杂环境下加固型抗震大楼爆破拆除及数值模拟预测[J].工程爆破,2015,21(4):24-28,68.
YANG Y, YANG R S, LI Q,et al.Rugged seismic building demolition blasting under complicated environment and its numerical simulation prediction[J].Engineering Blasting,2015,21(4):24-28,68.
[4]费鸿禄,刘志东,戴明颖.复杂环境下10层非对称框架结构楼房定向爆破拆除[J].爆破,2015,32(2):89-94.
FEI H L, LIU Z D, DAI M Y.Directional explosive demolition of ten-storey dissymmetry building in complicated situation[J].Blasting,2015,32(2):89-94.
[5]马洪涛,孟祥栋,李远明,等.高耸钢筋混凝土桥梁实体墩柱的拆除爆破[J].爆破,2011,28(1):74-77.
MA H T, MENG X D, LI Y M, et al.Explosive demolition of high entity pillars of reinforced concrete bridge[J].Blasting,2011,28(1):74-77.
[6]范作鹏,黄治成,刘高.复杂环境下钢筋混凝土基础爆破拆除实践[J].矿冶工程,2010,30(5):9-11.
FAN Z P, HUANG Z C,LIU G. Practice of blasting demolition of reinforced concrete foundation under complex environment[J].Mining and Metallurgical Engineering,2010,30(5):9-11.
[7]王小林,靳龙,曾庆元,等.混凝土围堰拆除爆破对大坝的安全影响分析[J].西安科技大学学报,2015,35(1):15-20.
WANG X L, JIN L, ZENG Q Y, et al. Influence of the concrete coffer demolition blasting on the dam safety[J].Journal of Xi’an University of Science and Technology,2015,35(1):15-20.
[8]孙金山,谢先启,王坤鹏,等.建(构)筑物墩柱爆破后裸露钢筋初弯曲失稳模型[J].爆破,2015,32(1):1-4,27.
?SUN J S, XIE X Q, WANG K P, et al.Initial bending instability model of exposed reinforcing bars in demolition projects[J].Blasting,2015,32(1):1-4,27.
[9]杨建军,黄磊,蔡伟.非对称钢筋混凝土框架结构楼房爆破拆除[J].爆破器材,2015,44(4):51-54,59.
?YANG J J, HUANG L, CAI W.Blasting demolition of a asymmetrical building with a reinforced concreted structure[J].Explosive Materials,2015,44(4):51-54,59.

备注/Memo

备注/Memo:
收稿日期:2018-03-29
基金项目:辽宁省自然科学基金(20170540456)
作者简介:范龙泉(1963-),男,高级工程师,主要从事城市建筑控制爆破。E-mail:1031726582@qq.com