[1]林飞.大型构筑物拆除爆破振动与塌落触地振动分析[J].爆破器材,2019,48(05):61-64.[doi:10.3969/j.issn.1001-8352.2019.05.012]
 LIN Fei.Analysis of Blasting Vibration and Collapse Ground-touching Vibration in Demolition of Large Structures[J].EXPLOSIVE MATERIALS,2019,48(05):61-64.[doi:10.3969/j.issn.1001-8352.2019.05.012]
点击复制

大型构筑物拆除爆破振动与塌落触地振动分析()
分享到:

《爆破器材》[ISSN:1001-8352/CN:32-1163/TJ]

卷:
48
期数:
2019年05
页码:
61-64
栏目:
爆破技术
出版日期:
2019-09-29

文章信息/Info

Title:
Analysis of Blasting Vibration and Collapse Ground-touching Vibration in Demolition of Large Structures
文章编号:
5319
作者:
林飞
中煤科工集团淮北爆破技术研究院有限公司(安徽淮北,235000)
Author(s):
LIN Fei
Huaibei Blasting Technology and Engineering Institute Co., Ltd., CCTEG (Anhui Huaibei, 235000)
关键词:
石灰窑爆破拆除爆破振动塌落触地振动振动测试大型构筑物
Keywords:
lime kiln blasting demolition blasting vibration collapse ground-touching vibration vibration test large structures
分类号:
TU746.5
DOI:
10.3969/j.issn.1001-8352.2019.05.012
文献标志码:
A
摘要:
对某两连体石灰窑的拆除爆破振动进行了监测,采集了石灰窑爆破及塌落产生的振动数据。石灰窑拆除塌落触地振动的场地常数K为0.132,衰减指数α为1.489,得出石灰窑塌落触地振动经验公式。爆破振动最大振动速度为3.287 cm/s,主频主要集中在6.104~28.076 Hz;塌落触地振动最大振动速度为7.322 cm/s,主频主要集中在2.441~6.714 Hz。塌落触地振动速度比爆破振动速度大,主频更接近建筑物的固有频率,因此,在大型构筑物倒塌方向应采取缓冲措施。这些资料可为石灰窑、烟囱及楼房等大型建筑物的爆破拆除设计及对周围环境的影响评估提供参考。
Abstract:
Demolition blasting vibration of a two-piece lime kiln was monitored, and the vibration data generated by blasting and lime kiln collapse were collected. The site constant K of the limestone kiln’s collapse and ground vibration is 0.132, and the attenuation index α is 1.489. Empirical formula of the lime kiln collapse grounding vibration was obtained. The maximum vibration velocity of blasting vibration is 3.287 cm/s, and the main frequency is mainly concentrated at 6.104-28.076 Hz. The maximum vibration velocity of collapse grounding vibration is 7.322 cm/s, and the main frequency is mainly concentrated at 2.441-6.714 Hz. Collapse ground-touching vibration speed is greater than that of blasting vibration, and the main frequency is closer to the natural frequency of the building. Therefore, buffer measures should be taken in the collapse direction of large structures. The study can provide reference for the blasting demolition design of large buildings such as lime kiln, chimney and buildings and the impact assessment of the surrounding environment.

参考文献/References:

[1]谢春明.基于爆炸载荷的框架结构建筑物拆除数值模拟研究[D].北京:北京理工大学,2016.
?XIE C M.Numerical simulation study of frame structure buildings demolition based on blasting load[D].Beijing:Beijing Institute of Technology,2016.
[2]徐长琦.高层建筑爆破中爆破与塌落振动对比分析[J].广东建材,2018(9):64-67.
[3]季杉,谢伟平,王礼.爆破振动与塌落触地振动特点及传播规律试验研究[J].振动与冲击,2018,37(11):195-201.
JI S,XIE W P,WANG L.Tests for ground vibration cha-racteristics and propagation laws due to blasting and touchdown impact[J].Journal of Vibration and Shock,2018,37(11):195-201.
[4]许名标.高耸构筑物爆破拆除触地振动试验研究[J].工程爆破,2015,21(2):30-35.
XU M B.Experimental study on blasting demolition touchdown vibration of the towering structure[J].Engineering Blasting,2015,21(2):30-35.
[5]黄小武.建(构)筑物爆破拆除塌落触地振动对地铁管片结构的影响研究[D].武汉:武汉科技大学,2015.
HUANG X W.Study on the influence of subway segments structure under impact vibration induced by collapse of building in demolition blasting[D]. Wuhan:Wuhan University of Science and Technology,2015.
[6]叶晓华,苏海军.立式石灰窑定向爆破拆除[J].爆破,2008,25(3):81-83.
YE X H,SU H J.Directional blasting demolition of vertical limekiln[J].Blasting,2008,25(3):81-83.
[7]王迪安.79 m高烟囱拆除爆破振动与塌落触地振动对比分析[J].工程爆破,2006,12(1):86-89.
WANG D A.Comparison between blasting vibration and touchdown vibration in demolishing collapse of a 79 m high chimney[J].Engineering Blasting,2006,12(1):86-89.
[8]周家汉.爆破拆除塌落振动速度计算公式的讨论[J].工程爆破,2009,15(1):1-4,40.
?ZHOU J H.Discussion on calculation formula of collapsing vibration velocity caused by blasting demolition[J].Engineering Blasting,2009,15(1):1-4,40.
[9]刘铭.爆破拆除建筑物塌落与触地振动响应分析[D].武汉:武汉理工大学,2014.
LIU M.Analysis of buildings collapsing by blasting demolition and touchdown vibration response[D]. Wuhan:Wuhan University of Technology,2014.

相似文献/References:

[1]赵坤,蒋昭镳.爆破拆除不同结构钢筋混凝土基础[J].爆破器材,2010,39(02):38.
 ZHAO Kun,JIANG Zhaobiao.Demolition Blasting of Different Structure Reinforced Concrete Foundation[J].EXPLOSIVE MATERIALS,2010,39(05):38.
[2]夏卫国,武双章,史常猛.华能莱芜发电厂5座冷却塔爆破拆除[J].爆破器材,2011,40(01):38.
 XIA Weiguo WU ShuangzhangSHI Changmeng.Blasting Demolishing of the Five Hyperbolic Cooling Towers for Huaneng Power Plant in Laiwu[J].EXPLOSIVE MATERIALS,2011,40(05):38.
[3]夏卫国,史长猛,武双章,等.谏壁电厂三座100m高钢筋混凝土烟囱爆破拆除[J].爆破器材,2011,40(02):36.
 XIA Weiguo,SHI Changmeng,WU Shuangzhang,et al.Demolition of the Three 100 mhigh Reinforced Concrete Chimneys of Jianbi Power Plant by Directional Blasting[J].EXPLOSIVE MATERIALS,2011,40(05):36.
[4]武双章,夏卫国,王德荣,等.2座150 m高钢筋混凝土烟囱爆破拆除应变分析[J].爆破器材,2011,40(06):37.
 WU Shuangzhang,XIA Weiguo,WANG Derong,et al.Strain Analysis in Blasting Demolition of Two 150 mhigh Reinforced Concrete Chimneys[J].EXPLOSIVE MATERIALS,2011,40(05):37.
[5]闫鸿浩,刘智远,李晓杰.烟囱爆破拆除及其振动测试分析[J].爆破器材,2013,42(03):21.[doi:10.3969/j.issn.1001-8352.2013.03.005]
 YAN Honghao,LIU Zhiyuan,LI Xiaojie.Chimney Blasting Demolition and Analysis of Vibration Measurement[J].EXPLOSIVE MATERIALS,2013,42(05):21.[doi:10.3969/j.issn.1001-8352.2013.03.005]
[6]李清,杨阳,杨仁树,等.基于MAT96本构模型的钢筋混凝土结构爆破拆除数值模拟[J].爆破器材,2015,44(01):41.[doi:10.3969/j.issn.1001-8352.2015.01.010]
 LI Qing,YANG Yang,YANG Renshu,et al.The Numerical Simulation of Reinforced Concrete Structure Blasting Based on MAT96 Constitutive Model[J].EXPLOSIVE MATERIALS,2015,44(05):41.[doi:10.3969/j.issn.1001-8352.2015.01.010]
[7]杨建军,黄磊,蔡伟.非对称钢筋混凝土框架结构楼房爆破拆除[J].爆破器材,2015,44(04):51.[doi:10.3969/j.issn.1001-8352.2015.04.012]
 YANG Jianjun,HUANG Lei,CAI Wei.Blasting Demolition of a Asymmetrical Building with a Reinforced Concreted Structure[J].EXPLOSIVE MATERIALS,2015,44(05):51.[doi:10.3969/j.issn.1001-8352.2015.04.012]
[8]杨仕教①,张文龙①②,郑建礼②.复杂环境下3座塔形框架结构景观房的控制爆破拆除[J].爆破器材,2016,45(01):51.[doi:10.3969/j.issn.1001-8352.2016.01.012]
 YANG Shijiao,ZHANG Wenlong,ZHENG Jianli.Controlled Balsting Demolition of Three Landscape Rooms with Turriform Frame Construction in Complicated Environment[J].EXPLOSIVE MATERIALS,2016,45(05):51.[doi:10.3969/j.issn.1001-8352.2016.01.012]
[9]彭泽森①,倪迪②,陶小钧②,等.隧道扩挖既有衬砌的爆破拆除[J].爆破器材,2019,48(06):48.[doi:10.3969/j.issn.1001-8352.2019.06.010]
 PENG Zesen,NI Di,TAO Xiaojun,et al.Blasting Demolition of Existing Lining in Tunnel Expansion Excavation[J].EXPLOSIVE MATERIALS,2019,48(05):48.[doi:10.3969/j.issn.1001-8352.2019.06.010]
[10]高文乐①,朱茂迅①,李元振①,等.发电厂双曲线型冷却塔的定向爆破拆除及爆破效果数值分析[J].爆破器材,2020,49(04):52.[doi:10.3969/j.issn.1001-8352.2020.04.009]
 GAO Wenle,ZHU Maoxun,LI Yuanzhen,et al.Directional Blasting Demolition of Hyperbolic Cooling Tower in Power Plant and Numerical Analysis of Blasting Outcome[J].EXPLOSIVE MATERIALS,2020,49(05):52.[doi:10.3969/j.issn.1001-8352.2020.04.009]

备注/Memo

备注/Memo:
收稿日期:2019-01-04
第一作者:林飞(1989-),男,工程师,研究方向为露天矿山与煤矿井下爆破的理论与技术。E-mail:357028615@qq.com
更新日期/Last Update: 2019-09-29