[1]路亮,龙源,谢全民,等.高层楼房爆破塌落振动对周边目标影响的测试与分析[J].爆破器材,2010,39(02):1-3.
 LU Liang,LONG Yuan,XIE Quanmin,et al.Influence Test and Analysis of Collapse Vibration of High-building Demolition Blasting on Surroundings[J].EXPLOSIVE MATERIALS,2010,39(02):1-3.
点击复制

高层楼房爆破塌落振动对周边目标影响的测试与分析()
分享到:

《爆破器材》[ISSN:1001-8352/CN:32-1163/TJ]

卷:
39
期数:
2010年02
页码:
1-3
栏目:
基础理论
出版日期:
2010-04-20

文章信息/Info

Title:
Influence Test and Analysis of Collapse Vibration of High-building Demolition Blasting on Surroundings
文章编号:
4236
作者:
路亮1龙源1谢全民1张洋溢1袁伟民2
(1.中国人民解放军理工大学工程兵工程学院,江苏南京210007;2.常州轻工业职业技术学院,江苏常州213000)
Author(s):
LU Liang LONG Yuan XIE Quanmin ZHANG Yangyi
1.Engineering Institute of Engineer Corps, PLA University of Science & Technology (Jiangsu Nanjing, 210007) YUAN Weimin 2.Changzhou Light Industrial Vocational and Technical College (Jiangsu Changzhou,213000)
关键词:
拆除爆破塌落振动振动测试
Keywords:
demolition blasting collapse vibration vibration test
分类号:
O383+.2
文献标志码:
A
摘要:
对哈尔滨市一幢16层楼房的爆破拆除过程进行了现场监测,获得了爆破和楼房倒塌过程中引起的地面质点的振动速度、频率等数据。分析测试结果表明,城市拆除爆破过程中爆破振动效应一般较小,而由于高层建筑物的体积、质量较大引起的塌落振动较大,对周围建筑物的影响较大。爆破振动频率高衰减快,而塌落振动频率低衰减慢,同时容易引起周围建筑物共振,产生破坏效应,因此必须采取有效的减震防护措施。
Abstract:
The demolition process of a 16th floor building in Harbin was monitored, and vibration velocity and frequency of ground particles were obtained during the blasting and collapsing process. The analysis of test results showed that effects of blasting vibration in the city demolition blasting process are generally small, however, large collapse vibration due to the volume and big quality of high buildings have more influence on surrounding buildings. High blasting vibration frequency attenuates fast, while low collapse vibration frequency attenuates slowly and easily causes the surrounding buildings sympathetic vibration and damage effects, therefore effective damping and preventive measures must be taken.

参考文献/References:

[1]王小林,徐书雷.国内外拆除爆破技术发展现状[J].西安科技学院学报,2003,9(3):270~273.[2]汪旭光,于亚伦.拆除爆破理论与工程实例[M].北京:人民交通出版社,2008.[3]王希之,王自力,龙源,徐全军.高层建筑物爆破拆除塌落振动的数学模型[J].爆炸与冲击,2002,22(2):188~192.[4]吕淑然,杨军,刘国振.高大建筑物定向爆破地震振动效应监测与控制研究[J].爆破,2003,9(3):71~74.

相似文献/References:

[1]张志呈,姚勇,龙林.钢筋混凝土框架后排立柱底端不装药爆破拆除效果分析[J].爆破器材,2009,38(06):26.
 ZHANG Zhicheng,YAO Yong,LONG Lin.Analysis on Blasting Demolition of RC Frame Structure with Back Columns Notblasted[J].EXPLOSIVE MATERIALS,2009,38(02):26.
[2]李兴华,龙源,钟明寿,等.哈尔滨龙海大厦拆除爆破中的减振技术研究[J].爆破器材,2009,38(06):30.
 LI Xinghua,LONG Yuan,ZHONG Mingshou,et al.Study on Technology of Vibration Reduction in Demolition Blasting of LongHai Mansion in Haerbin[J].EXPLOSIVE MATERIALS,2009,38(02):30.
[3]崔晓荣,周听清,李战军.超大规模起爆网络在拆除爆破中的应用研究[J].爆破器材,2009,38(01):14.
 CUI Xiaorong.,ZHOU Tingqing,LI Zhanjun.Application Study on Super Priming Circuit Used in Blasting Demolition[J].EXPLOSIVE MATERIALS,2009,38(02):14.
[4]毛益松①,王升②,单志国②,等.深孔爆破技术在板肋石拱桥爆破拆除中的应用[J].爆破器材,2013,42(01):35.[doi:10.3969/j.issn.1001-8352.2013.01.010]
 MAO Yisong,WANG Sheng,SAN Zhiguo,et al.The Application of Deephole Blasting Technology in the Blasting Demolition of Ribbed Slab Stone Arch Bridge[J].EXPLOSIVE MATERIALS,2013,42(02):35.[doi:10.3969/j.issn.1001-8352.2013.01.010]
[5]闫鸿浩,刘智远,李晓杰.烟囱爆破拆除及其振动测试分析[J].爆破器材,2013,42(03):21.[doi:10.3969/j.issn.1001-8352.2013.03.005]
 YAN Honghao,LIU Zhiyuan,LI Xiaojie.Chimney Blasting Demolition and Analysis of Vibration Measurement[J].EXPLOSIVE MATERIALS,2013,42(02):21.[doi:10.3969/j.issn.1001-8352.2013.03.005]
[6]吴久荣①,张志呈②,肖定军②,等.定向爆破拆除偏斜烟囱[J].爆破器材,2008,37(05):30.
 Wu Jiurong,Zhang Zhicheng,Xiao Dingjun,et al.Demolition of a Leaning Brick-structural Chimney by Directional Blasting[J].EXPLOSIVE MATERIALS,2008,37(02):30.
[7]吴久荣①,张志呈②,肖定军②,等.机立窑生产线定向拆除爆破[J].爆破器材,2008,37(04):21.
 Wu Jiurong,Zhang Zhicheng,Xiao Dingjun,et al.Demolition of the Mechanized Shaft Kiln by Directional Blasting[J].EXPLOSIVE MATERIALS,2008,37(02):21.
[8]梁书锋①,王建国②,李鹏飞③,等.40 m青砖烟囱定向控制爆破拆除技术[J].爆破器材,2018,47(04):60.[doi:10.3969/j.issn.1001-8352.2018.04.011]
 LIANG Shufeng,WANG Jianguo,LI Pengfei,et al.Demolition of a 40 m-high Black Brick Chimney by Directional Controlled Blasting[J].EXPLOSIVE MATERIALS,2018,47(02):60.[doi:10.3969/j.issn.1001-8352.2018.04.011]
[9]姚显春①,姚尧①②,张伟②,等.高层框-剪结构建筑的定向爆破拆除[J].爆破器材,2019,48(03):49.[doi:10.3969/j.issn.1001-8352.2019.03.010]
 YAO Xianchun,YAO Yao,ZHANG wei,et al.Directional Blasting Demolition of a High Rise Buiding with a Frame-shear Structure[J].EXPLOSIVE MATERIALS,2019,48(02):49.[doi:10.3969/j.issn.1001-8352.2019.03.010]
[10]高文乐①,赵德龙①,李元振①,等.延期时差对多截面承重立柱框架结构拆除爆破效果的影响[J].爆破器材,2021,50(02):50.[doi:10.3969/j.issn.1001-8352.2021.02.010]
 GAO Wenle,ZHAO Delong,LI Yuanzhen,et al.Influence of Delayed Time Difference on Demolition Blasting Effect of Multi-Section Load-Bearing Column Frame Structure[J].EXPLOSIVE MATERIALS,2021,50(02):50.[doi:10.3969/j.issn.1001-8352.2021.02.010]

备注/Memo

备注/Memo:
收稿日期:2009-10-23作者简介:路亮(1983~),男,助理工程师,硕士在读,主要从事工程爆破器材及应用技术研究。
更新日期/Last Update: 2011-03-24