[1]綦晓磊, 梁彦波, 宋肖杰, 等. 切割槽拉槽爆破悬顶现象产生的原因及处理技术[J]. 中国矿山工程, 2015, 44(1): 32-34.
QI X L, LIANG Y B, SONG X J, et al. Reason of causing flap top in cutting and kerf blasting and its treatment measures [J]. China Mine Engineering, 2015, 44(1): 32-34.
[2]岳建忠. 无切割井拉槽法在茶店磷矿的成功应用[J]. 中国矿业, 2006, 15(8): 73-74.
YUE J Z. Application of pull open grooving without grooving well in Cha Dian Phosphate Mine [J]. China Mining Magazine, 2006, 15(8): 73-74.
[3]陶铿. 无切割井一次爆破拉槽法试验[J]. 化工矿山技术, 1983(5): 19-20.
[4]郭良银, 蒋万飞, 宋召法, 等. 新城金矿阶段空场嗣后充填法开采大直径深孔切槽爆破方法[J]. 黄金科学技术, 2022, 30(4): 585-593.
GUO L Y, JIANG W F, SONG Z F, et al. Large diameter long hole cutoff slot blasting method for sublevel open stoping with delayed filling in Xincheng Gold Mine [J]. Gold Science and Technology, 2022, 30(4): 585-593.
[5]王晓涛, 齐朝鹏, 郭子林, 等. “双碳”目标下倾斜厚矿体切割槽的优化设计与施工[J]. 有色金属(矿山部分), 2023, 75(1): 34-38.
WANG X T, QI Z P, GUO Z L, et al. Optimized design and construction of inclined thick ore body cutting trough under “double carbon” target [J]. Nonferrous Metals (Mine Section), 2023, 75(1): 34-38.
[6]郑跃飞, 蒋荣, 孙海帝, 等. 湖南某矿山切割槽爆破参数优化[J]. 采矿技术, 2020, 20(2): 125-126, 130.
[7]何斌全, 高宇梁, 张德明, 等. 中深孔切槽爆破设计与起爆网路可靠性分析[J]. 爆破, 2014, 31(4): 26-30.
HE B Q, GAO Y L, ZHANG D M, et al. Middeep hole blasting design on cutting grooves and reliability analysis of blasting circuit [J]. Blasting, 2014, 31(4): 26-30.
[8]罗佳, 柳小胜, 宋嘉栋, 等. 地下采矿切割槽形成技术研究[J]. 有色金属(矿山部分), 2015, 67(6): 14-19.
LUO J, LIU X S, SONG J D, et al. Study on cutting groove forming technology of underground mining [J]. Nonferrous Metals (Mine Section), 2015, 67(6): 14-19.
[9]赵兴东, 曾楠, 陈玉民, 等. 三山岛金矿井下无人开采区域中深孔落矿嗣后充填连续采矿工艺设计[J]. 黄金科学技术, 2021, 29(2): 200-207.
ZHAO X D, ZENG N, CHEN Y M, et al. Design of the medium-deep hole caving and subsequent filling continuous mining technology in underground unmanned mining area of Sanshandao Gold Mine [J]. Gold Science and Technology, 2021, 29(2): 200-207.
[10]赵兴东, 周鑫, 赵一凡, 等. 三山岛金矿连续规模化智能开采工艺研究及应用[J]. 金属矿山, 2022(5): 45-49.
ZHAO X D, ZHOU X, ZHAO Y F, et al. Study and application of continuous large-scale intelligent mining technology in Sanshandao Gold Mine [J]. Metal Mine, 2022(5): 45-49.[11]VILLAESCUSA E. Geotechnical design for sublevel open stoping [M]. New York: CRC Press, 2014.
[12]安龙, 张家华, 李元辉, 等. 急倾斜薄矿脉夹制作用下中深孔爆破模拟与参数优化[J]. 东北大学学报(自然科学版), 2022, 43(4): 567-574.
AN L, ZHANG J H, LI Y H, et al. Simulation and parameters optimization of medium deep hole blasting in steeply narrow vein mine under confinement [J]. Journal of Northeastern University (Natural Science), 2022, 43(4): 567-574.
[13]WANG Z L, WANG H C, WANG J G, et al. Finite element analyses of constitutive models performance in the simulation of blast-induced rock cracks [J]. Computers and Geotechnics, 2021, 135: 104172.
[14]凌天龙, 王宇涛, 刘殿书, 等. 修正RHT模型在岩体爆破响应数值模拟中的应用[J]. 煤炭学报, 2018, 43(增刊2): 434-442.
LING T L, WANG Y T, LIU D S, et al. Modified RHT model for numerical simulation of dynamic response of rock mass under blasting load [J]. Journal of China Coal Society, 2018, 43(Suppl.2): 434-442.
[15]王卫华, 刘洋, 张理维, 等. 基于RHT模型双孔同时爆破均质岩体损伤的数值模拟[J]. 黄金科学技术, 2022, 30(3): 414-426.
WANG W H, LIU Y, ZHANG L W, et al. Numerical simulation of homogeneous rock mass damage caused by two-hole simultaneous blasting based on RHT model [J]. Gold Science and Technology, 2022, 30(3): 414-426.