[1]杨志红,郑文富,何慧明,等.框架核心筒结构高层建筑的对向倒塌爆破拆除[J].爆破器材,2022,51(06):60-64.[doi:10.3969/j.issn.1001-8352.2022.06.010]
 YANG Zhihong,ZHENG Wenfu,HE Huiming,et al.Demolition of High-Rise Buildings with Frame-Core Tube Structure by Opposite Collapse Blasting[J].EXPLOSIVE MATERIALS,2022,51(06):60-64.[doi:10.3969/j.issn.1001-8352.2022.06.010]
点击复制

框架核心筒结构高层建筑的对向倒塌爆破拆除()
分享到:

《爆破器材》[ISSN:1001-8352/CN:32-1163/TJ]

卷:
51
期数:
2022年06
页码:
60-64
栏目:
爆破技术
出版日期:
2022-11-25

文章信息/Info

Title:
Demolition of High-Rise Buildings with Frame-Core Tube Structure by Opposite Collapse Blasting
文章编号:
5737
作者:
杨志红郑文富何慧明陈亚伟
广东中人爆破工程有限公司(广东广州, 510640)
Author(s):
YANG Zhihong ZHENG Wenfu HE Huiming CHEN Yawei
Guangdong Zhongren Blasting Engineering Co., Ltd. (Guangdong Guangzhou, 510640)
关键词:
框架核心筒结构对向倒塌双切口爆破拆除
Keywords:
frame-core tube structure opposite collapse double-incision blasting demolition
分类号:
TU746.5
DOI:
10.3969/j.issn.1001-8352.2022.06.010
文献标志码:
A
摘要:
介绍了城市复杂环境中采用双切口对向倒塌爆破拆除两栋高层框架核心筒结构大楼的工程实例。根据框架核心筒结构特点,结合场地周边环境,选择对向倒塌的爆破方案。先爆建筑采用双切口方式,后爆建筑采用单切口方式,通过四通与簇联相结合的复式起爆网路,楼间间隔3 s延时起爆,实现大楼逐栋倒塌解体;采用主动防护与被动防护相结合的安全防护技术,有效地控制了爆破振动、塌落振动和爆破飞散物,取得了良好的爆破效果。
Abstract:
An engineering example of demolishing two high-rise buildings with frame-core tube structure by double incision and opposite direction collapse blasting in a complex urban environment was introduced. According to the structural characteristics of the frame core tube and the surrounding environment of the site, the opposite collapse blasting scheme was selected. Double-incision blasting method was adopted for the first blasted building, and the single-incision blasting method was adopted for the later blasted building. Multiple initiation network combined with four-way and cluster connection was used. The delay time of initiation between the buildings was three seconds, and the buildings collapsed and disintegrated one by one. The safety protection technology combining active protection and passive protection was adopted to control blasting vibration, collapse vibration and flying objects effectively, and good blasting outcomes have been achieved.

参考文献/References:

[1]周凤仪, 陈隆, 胡少愚.九层框架楼房的双向折叠爆破[J].采矿技术, 2014, 14(5): 108-110.
[2]郭进, 公文新.高层框架楼房单向折叠爆破拆除[J].工程爆破, 2016, 22(6): 58-61.
GUO J, GONG W X. Demolition of highrise frame building by unidirectional folding blasting [J]. Engineering Blasting, 2016, 22(6): 58-61.
[3]朱朝祥, 吴岩, 崔允武.十四层框架结构办公楼的爆破拆除[J]. 工程爆破, 2007,13(3): 59-61, 52.
ZHU C X, WU Y, CUI Y W. Blasting demolition of an old fourteen storeys office building [J]. Engineering Blasting, 2007, 13(3): 59-61, 52.
[4]费鸿禄, 杨小庚, 周健华, 等.18层框架楼房定向爆破倒塌迟缓原因分析[J].爆破, 2017, 34(4): 149-154, 174.
FEI H L, YANG X G, ZHOU J H, et al. Analysis of collapse delay causes of directional explosive demolition in 18 layers frame buildings [J]. Blasting, 2017, 34(4): 149-154, 174.
[5]赵红宇, 王守祥, 刘云剑, 等.高层框架剪力墙结构楼房的控制爆破拆除[J]. 爆破, 2008, 25(2): 53-56.
ZHAO H Y, WANG S X, LIU Y J, et al. Demolition of high frame shear-wall structure by controlled blasting [J]. Blasting, 2008, 25(2): 53-56.
[6]徐再楼.基于分离式共节点模型的建筑物定向倾倒切口数值模拟研究[J].现代电子技术, 2016, 39(21): 137-140.
XU Z L. Numerical simulation of separated common-node model based incision parameter of building directional collapse [J]. Modern Electronic Technology, 2016, 39(21): 137-140.
[7]李友军, 张北龙, 郑耿, 等.高层建筑物多切口大角度定向爆破技术与应用[J].工程爆破, 2019, 25(2): 45-50, 56.
LI Y J, ZHANG B L, ZHENG G, et al. Technology and practice of multiple incision and large angle directional blasting in high-rise buildings [J]. Engineering Blasting, 2019, 25(2): 45-50, 56.
[8]叶海旺, 李庆, 郑长青, 等. 22层框架楼房定向爆破拆除倒塌过程分析[J]. 爆破, 2021, 38(2): 111-117.
YE H W, LI Q, ZHENG C Q, et al. Analysis of collapse process of 22-story frame building demolished by directional blasting [J]. Blasting, 2021, 38(2): 111-117.
[9]郑建礼, 姜宝金, 胡光球, 等.全剪力墙结构楼房的定向爆破拆除[J].爆破器材, 2018, 47(3): 55-59.
ZHENG J L, JIANG B J, HU G Q, et al. Blasting demolition of a building with full shear wall structure [J]. Explosive Materials, 2018, 47(3): 55-59.
[10]董保立, 张纪云, 王晓, 等.复杂环境下12层框剪结构楼房爆破拆除[J].工程爆破, 2017, 23(2): 58-61.
DONG B L, ZHANG J Y, WANG X, et al. Blasting demolition of a 12storey frame shear structure building under complicated environment [J]. Engineering Blasting, 2017, 23(2): 58-61.

备注/Memo

备注/Memo:
收稿日期:2022-07-04
第一作者:杨志红(1978-),男,硕士,高工,主要从事工程爆破技术方面的研究。E-mail:53619574@qq.com
通信作者:郑文富(1991-),男,硕士,工程师,主要从事工程爆破技术方面的研究。E-mail:1967388410@qq.com
更新日期/Last Update: 2022-11-23