[1]钟元清,徐其敏,吴显军.4栋整浇全剪力墙结构高层住宅楼爆破拆除[J].爆破,2020,37(1):102-106.
ZHONG Y Q,XU Q M,WU X J. Blasting demolition of four high-rise residential buildings with full-cast and full-shear wall structures[J].Blasting, 2020, 37(1):102-106.
[2]周家汉.爆破拆除塌落振动速度计算公式的讨论[J].工程爆破, 2009,15(1):1-4, 40.
ZHOU J H. Discussion on calculation formula of collapsing vibration velocity caused by blasting demolition[J].Engineering Blasting,2009, 15(1): 1-4,40.
[3]齐世福,夏裕帅,谢兴博,等.复杂环境下高大楼房控制爆破技术[J].工程爆破,2015,21(1): 20-24,4.
QI S F, XIA Y S, XIE X B, et al. The controlled blasting technique for demolishing a high building in complicated surrounding[J]. Engineering Blasting, 2015, 21(1): 20-24, 4.?
[4]刘士兵,贺攀,程赛珍.单向三折叠拆除爆破技术在复杂环境下的应用[J].工程爆破,2019,25(5):57-62.
LIU S B, HE P, CHENG S Z. Application of unidirectional three fold demolition blasting technology in complex environment[J].Engineering Blasting, 2019,25(5):57-62.
[5]贾永胜,谢先启,姚颖康,等.高层建筑物折叠爆破拆除关键技术参数探讨[J].爆破,2016,33(3):75-80, 131.
JIA Y S, XIE X Q,YAO Y K, et al.Discussed on key parameters of folding explosive demolition of high high-rise building[J].Blasting, 2016,33(3):75-80, 131.
[6]辛振坤,泮红星,骆利锋,等.18层大厦双向三次折叠控制爆破技术[J].工程爆破,2015, 21(4): 33-36, 62.
XIN Z K, PAN H X, LUO L F, et al. The controlled blasting technology in bidirection-3-times-folding of 18-storey building[J].Engineering Blasting,2015,21(4):33-36, 62.
[7]李高锋, 易克, 李星, 等.18层“高脚杯”形剪力墙结构楼房爆破拆除[J].工程爆破,2015, 21(3): 46-49.
LI G F, YI K, LI X, et al. Blasting demolition of 18storey and goblet-shape building of shear wall structure[J].Engineering Blasting, 2015, 21(3): 46-49.
[8]徐洋,谢全民,梅比,等.远程测振系统在群楼拆除爆破振动监测中的应用[J].工程爆破,2019,25(6):80-84.
XU Y, XIE Q M, MEI B, et al.Application of remote vibration measurement system in monitoring the vibration of demolition blasting of group-buildings[J].Engineering Blasting,2019,25(6):80-84.
[9]张明,刘军,贾永胜,等.切口方式与延期时差对框架结构爆破拆除效果的影响[J].爆破,2017,34(2):1-8.
ZHANG M, LIU J, JIA Y S, et al. Influence of cut pattern and delay time difference on effect of frame structure explosive demolition[J]. Blasting,2017,34(2):1-8.?
[10]汪旭光,于亚伦. 拆除爆破理论与工程实例[M]. 北京: 人民交通出版社,2008:103.
[11]汪旭光. 爆破设计与施工[M]. 北京: 冶金工业出版社,2011: 692-694.
[12]郑建礼,姜宝金,胡光球,等.全剪力墙结构楼房的定向爆破拆除[J].爆破器材,2018,47( 3) : 55-59.
ZHENG J L, JIANG B J, HU G Q, et al.Blasting demolition of a building with full shear wall structure[J].Explosive Materials,2018,47 ( 3 ) : 55-59.
[13]易克,李高锋,张文杰,等.异形全剪力墙结构危楼定向爆破拆除技术[J].工程爆破,2015,21(4) : 29-32,53.
YI K, LI G F, ZHANG W J, et al. The directional blasting technology of special shear wall structure of dangerous buildings[J].Engineering Blasting,2015,21(4) : 29-32,53.
[14]吉建华, 池恩安. 高层剪力墙结构楼房拆除爆破切口的设计[J].现代矿业, 2017(2) : 206-208,211.
[15]刘昌邦,贾永胜,黄小武,等.异形结构楼房纵向逐跨空中解体爆破拆除[J].爆破,2019,36(3) : 84-89.
LIU C B, JIA Y S, HUANG X W, et al. Blasting demolition technology of longitudinal collapse and aerial disintegration for special-shaped[J]. Blasting,2019,36(3): 84-89.