GAO W L, ZHANG Z H, SU K K,et al. Directional blasting demolition of hotel with multi-section bearing colum[J]. Engineering Blasting, 2018, 24(2): 59-65.
[2]王涛,宋庆刚,谢春明,等.爆炸荷载下六层框架结构建筑爆破拆除数值模拟[J].爆破,2014,31(2):104-107,110.
WANG T,SONG Q G,XIE C M, et al. Numerical Simulation of six-story frame structure explosive demolition under explosive loading [J]. Blasting, 2014,31(2):104-107,110.
[3]张明,刘军,贾永胜,等.切口方式与延期时差对框架结构爆破拆除效果的影响[J].爆破,2017,34(2):1-8.
ZHANG M, LIU J, JIA Y S, et al. Influence of cut pattern and delay time difference on effect of frame structure explosive demolition [J]. Blasting, 2017,34 (2):1-8.
[4]李胜林,王宇涛,黄明升,等.单榀钢混框架结构内爆法拆除模拟[J].北京理工大学学报,2012,32(4):354-357,385.
LI S L, WANG Y T, HUANG M S, et al. Numerical simulation of single concrete framework implosion demolition [J].Transactions of Beijing Institute of Technology, 2012,32 (4): 354-357,385.
[5]田水龙,张程娇,黄雄,等.8层框架结构楼房爆破拆除后坐数值模拟[J].工程爆破,2019,25(1):13-18.
TIAN S L, ZHANG C J, HUANG X, et al. Numerical simulation of backward collapse in blasting demolition of 8-storey frame building [J]. Engineering Blasting, 2019,25 (1): 13-18.
[6]徐鹏飞. 拆除爆破中钢筋混凝土本构模型及应用研究[D].北京:中国矿业大学(北京),2017.
XU P F. Study on reinforced concrete constitutive model and its application in blasting demolition [D]. Beijing:China University of Mining and Technology(Beijing), 2017.
[7]费鸿禄,刘梦,张玉莹,等.10层框架结构楼房爆破拆除的数值模拟[J].工程爆破,2016,22(3):48-53.
FEI H L, LIU M, ZHANG Y Y, et al. Numerical simulation of blasting demolition of 10-storey frame structure building [J]. Engineering Blasting, 2016,22(3): 48-53.
[8]余德运,杨军,陈大勇,等.基于分离式共结点模型的钢筋混凝土结构爆破拆除数值模拟[J].爆炸与冲击,2011,31(4):349-354.
YU D Y, YANG J, CHEN D Y, et al. Numerical simulation of reinforced concrete structure based on separate element and common node model [J]. Explosion and Shock Waves, 2011, 31(4): 349-354.?
[9]吴建宇,龙源,纪冲,等.城市高层框架-筒体结构建筑物拆除数值模拟研究[J].爆破,2015,32(2):95-99.
WU J Y, LONG Y, JI C, et al. Numerical simulation of explosive demolition of urban high-steered frame-tube structures [J]. Blasting, 2015,32 (2): 95-99.
[10]周丹. 爆破拆除框架结构建筑物的力学模型及工程应用[D].长沙:中南林学院,2005.
ZHOU D. Study on the mechanical model and enginee-ring apply of blasting demolition of reinforced frame structures [D]. Changsha:Central South Forestry University, 2005.
[11]徐轩,徐颖,刘伟,等.延期间隔对建筑物拆除爆破效果的影响[J].爆破,2017,34(1):143-147.
XU X, XU Y, LIU W, et al. Effect of delay intervals on building demolition with explosive[J].Blasting, 2017,34(1):143-147.
[12]康翠平,高艳敏,孙江,等.14层办公楼定向爆破拆除[J].工程爆破,2008,14(4):43-45.
KANG C P, GAO Y M, SUN J, et al. Directional blasting demolition of 14-storey office building [J]. Engineering Blasting, 2008,14 (4): 43-45.
[13]范龙泉,李小帅,李杜一,等.毫秒微差爆破在高层楼房拆除中的应用与研究[J].爆破器材,2018,47(5):54-58,64.
FAN L Q, LI X S, LI D Y, et al. Application and study of millisecond delay blasting technology in high-rise building demolition blasting [J]. Explosive Materials,2018,47(5):54-58,64.