[1]高文乐①,朱茂迅①,李元振①,等.发电厂双曲线型冷却塔的定向爆破拆除及爆破效果数值分析[J].爆破器材,2020,49(04):52-57.[doi:10.3969/j.issn.1001-8352.2020.04.009]
 GAO Wenle,ZHU Maoxun,LI Yuanzhen,et al.Directional Blasting Demolition of Hyperbolic Cooling Tower in Power Plant and Numerical Analysis of Blasting Outcome[J].EXPLOSIVE MATERIALS,2020,49(04):52-57.[doi:10.3969/j.issn.1001-8352.2020.04.009]
点击复制

发电厂双曲线型冷却塔的定向爆破拆除及爆破效果数值分析()
分享到:

《爆破器材》[ISSN:1001-8352/CN:32-1163/TJ]

卷:
49
期数:
2020年04
页码:
52-57
栏目:
爆破技术
出版日期:
2020-07-03

文章信息/Info

Title:
Directional Blasting Demolition of Hyperbolic Cooling Tower in Power Plant and Numerical Analysis of Blasting Outcome
文章编号:
5444
作者:
高文乐朱茂迅李元振张泽华
①山东科技大学土木工程与建筑学院(山东青岛,266590)
②中国石油大学(华东)储运与建筑工程学院(山东青岛,266580)
Author(s):
GAO Wenle ZHU Maoxun LI Yuanzhen ZHANG Zehua
①College of Civil Engineering and Architecture, Shandong University of Science and Technology(Shandong Qingdao, 266590)
②College of Pipeline and Civil Engineering, China University of Petroleum (East China)(Shandong Qingdao, 266580)
关键词:
双曲线型冷却塔复杂环境爆破拆除数值模拟
Keywords:
hyperbolic cooling tower complex environment blasting demolition numerical simulation
分类号:
TU746.5
DOI:
10.3969/j.issn.1001-8352.2020.04.009
摘要:
针对复杂环境下92 m高待拆除双曲线型冷却塔,采用矩形爆破切口、预开定向窗、简化爆破切口和预留支撑墙的定向爆破拆除方案,达到了预期的爆破效果。运用动力有限元软件ANSYS/LS-DYNA对冷却塔的爆破拆除倒塌过程进行了数值模拟,进一步验证爆破拆除方案。数值模拟结果和实际爆破效果对比分析表明,使用ANSYS/LS-DYNA模拟冷却塔的倒塌过程比较符合实际的爆破拆除过程,并可为更好地优化爆破拆除设计方案提供一定的参考。
Abstract:
Blasting demolition plan including rectangular blasting cut, pre-opening directional window, simplifying blasting cut and reserving support wall was carried out and achieved the expected blasting effect in blasting a 92m-high hyperbolic cooling tower within a complex environment. Collapse process simulation of the cooling tower under blasting demolition using the dynamic finite element software ANSYS/LS-DYNA further verified the reasonability of blasting demolition plan. According to comparative analysis between numerical simulation and actual blasting, it was shown that the simulation of the collapse process of the cooling tower by ANSYS/ LS-DYNA fits well with the actual blasting demolition process. It can be used to simulate the whole process of blasting demolition and provide some reference for optimizing the design plan of blasting demolition.

参考文献/References:

[1]付天杰,赵超群,梁儒,等.竖向切缝在高大冷却塔拆除爆破中的作用[J].工程爆破,2011,17(4):58-62.
FU T J, ZHAO C Q, LIANG R, et al. Application of vertical cut in demolition blasting of tall cooling tower [J]. Engineering Blasting, 2011,17 (4): 58 -62.
[2]刘宏刚,刘殿书,董太明. 冷却塔拆除爆破切口形式与关键技术探讨[C]//第九届全国工程爆破学术会议论文集. 青岛:中国力学学会,中国工程爆破协会,2008: 493-498.
[3]何松. 爆破拆除薄壁双曲线冷却塔塔壁扭曲撕裂变形规律研究[D].贵阳:贵州大学,2016.
HE S. The research on the distortion and avulsion’ characteristics of thin -walled hyperbolic cooling tower in blasting demolition [D]. Guiyang: Guizhou University, 2016.
[4]高文乐,苏凯凯,张泽华, 等.复杂环境下90 m高冷却塔的爆破拆除[J].爆破,2017,34(4):100-105.
GAO W L, SU K K, ZHANG Z H, et al. Explosive demolition of 90m-high cooling tower under complex environment[J]. Blasting, 2017, 34(4): 100-105.
[5]国家安全生产监督管理局. 爆破安全规程:GB 6722—2014[S]. 北京:中国标准出版社,2015.
State Administration of Work Safety. Blasting safety regulations: GB 6722—2014 [S]. Beijing: China Standards Press, 2015.
[6]谢春明,杨军,薛里.高耸筒形结构爆破拆除的数值模拟[J].爆炸与冲击,2012,32(1):73-78.
XIE C M, YANG J, XUE L. Numerical simulation of towering tubby structure blasting demolition [J]. Explosion and Shock Waves, 2012,32(1): 73-78.
[7]王礼. 复杂环境下高耸建筑物倒塌过程的数值模拟[D].包头:内蒙古科技大学,2011.
WANG L. Numerical simulation of the collapsing course of towering building under the complex environment[D]. Baotou:Inner Mongolia University of Science and Technology, 2011.
[8]张文龙. 钢筋混凝土结构冷却塔爆破拆除设计与数值仿真[D].衡阳:南华大学,2016.
ZHANG W L. Design and simulation for demolition blasting of reinforced framing cooling tower [D]. Hengyang: University of South China, 2016.
[9]李勇. 高耸构筑物拆除爆破倒塌过程的数值模拟与应用[D].贵阳:贵州大学,2016.
LI Y. Numerical simulation and application of demolition and blasting collapse process of high rise building [D]. Guiyang:Guizhou University, 2016.
[10]袁绍国,王礼,魏鑫,等.复杂环境下冷却塔倒塌过程的计算机模拟[J].爆破,2011,28(3):26-29.
YUAN S G, WANG L, WEI X, et al. Numerical simulation on collapse process of cooling tower in complex environment[J]. Blasting, 2011, 28(3): 26-29.
[11]王铁,刘立雷.冷却塔定向爆破拆除及爆破效果有限元数值模拟[J].爆破,2011,28(1):67-70.
WANG T, LIU L L. Directional explosive demolition of cooling tower and its numerical simulation process [J]. Blasting, 2011, 28(1): 67-70.
[12]蒋超,郭子如.冷却塔爆破拆除的数值模拟研究[J].爆破,2014,31(1):92-95.
JIANG C, GUO Z R. Numerical simulation of explosive demolition of cooling towers[J]. Blasting, 2014, 31 (1): 92-95.
[13]李洪伟,颜事龙,郭进,等.爆破拆除切口形状对冷却塔爆破效果影响及数值模拟[J].爆破, 2013, 30(4):92-95.
LI H W, YAN S L, GUO J, et al. Numerical simulation of effect of cut parameters on explosive demolition of cooling towers[J]. Blasting, 2013, 30(4): 92-95.
[14]张宝岗,赵明生,余红兵,等.切口角度对冷却塔爆破拆除影响研究[J].爆破,2018,35(1):109-115.
ZHANG B G, ZHAO M S, YU H B, et al. Study on influence of cut angle on explosive demolition of cooling tower [J]. Blasting, 2018, 35(1): 109-115.
[15]李勇,池恩安,张义平,等.复杂环境下高危双曲线冷却塔爆破拆除[J].爆破,2016,33(2):102-106.
LI Y, CHI E A, ZHANG Y P, et al. Explosive demolition of high-risk hyperbolic cooling tower under complex environment [J]. Blasting, 2016, 33(2): 102-106.
[16]詹振锵,赵明生,池恩安,等.数值模拟在冷却塔爆破拆除中的应用[J].爆破,2012,29(1):73-76.

相似文献/References:

[1]杨建军,黄磊,蔡伟.非对称钢筋混凝土框架结构楼房爆破拆除[J].爆破器材,2015,44(04):51.[doi:10.3969/j.issn.1001-8352.2015.04.012]
 YANG Jianjun,HUANG Lei,CAI Wei.Blasting Demolition of a Asymmetrical Building with a Reinforced Concreted Structure[J].EXPLOSIVE MATERIALS,2015,44(04):51.[doi:10.3969/j.issn.1001-8352.2015.04.012]
[2]谭志敏,朱真.场地狭窄条件下65 m高烟囱的双切口单向折叠爆破拆除[J].爆破器材,2017,46(01):55.[doi:10.3969/j.issn.1001-8352.2017.01.012]
 TAN Zhimin,ZHU Zhen.Unidirectional Folding Blasting Demolition with Double Incision of a 65 m High Chimney under the Condition of Narrow Space[J].EXPLOSIVE MATERIALS,2017,46(04):55.[doi:10.3969/j.issn.1001-8352.2017.01.012]
[3]梁书锋①,王建国②,李鹏飞③,等.40 m青砖烟囱定向控制爆破拆除技术[J].爆破器材,2018,47(04):60.[doi:10.3969/j.issn.1001-8352.2018.04.011]
 LIANG Shufeng,WANG Jianguo,LI Pengfei,et al.Demolition of a 40 m-high Black Brick Chimney by Directional Controlled Blasting[J].EXPLOSIVE MATERIALS,2018,47(04):60.[doi:10.3969/j.issn.1001-8352.2018.04.011]
[4]刘文广.中心城区超高层楼群多切口折叠爆破拆除[J].爆破器材,2021,50(05):58.[doi:10.3969/j.issn.1001-8352.2021.05.010]
 LIU Wenguang.Folding Blasting Demolition with Multiple Cuts of Super High-Rise Buildings in Central Urban Area[J].EXPLOSIVE MATERIALS,2021,50(04):58.[doi:10.3969/j.issn.1001-8352.2021.05.010]
[5]王景春,刘凯林,李永昊.西部高海拔环境下山岭隧道施工中的微振控制爆破技术[J].爆破器材,2022,51(05):54.[doi:10.3969/j.issn.1001-8352.2022.05.010]
 WANG Jingchun,LIU Kailin,LI Yonghao.Micro-Vibration Controlled Blasting Technology in the Construction of Mountain Tunnel under High Altitude Environment in Western China[J].EXPLOSIVE MATERIALS,2022,51(04):54.[doi:10.3969/j.issn.1001-8352.2022.05.010]

备注/Memo

备注/Memo:
收稿日期:2020-01-08
基金项目:国家自然科学基金(51874189)
第一作者:高文乐(1966-),男,教授,主要从事岩土力学和爆破安全技术的教学和科研工作。E-mail:wenlegao@163.com
通信作者:朱茂迅(1995-),男,硕士研究生,主要从事岩土力学和爆破安全技术的研究。E-mail772420017@qq.com
更新日期/Last Update: 2020-07-03