参考文献/References:
[1]谢春明.基于爆炸载荷的框架结构建筑物拆除数值模拟研究[D].北京:北京理工大学,2016.
?XIE C M.Numerical simulation study of frame structure buildings demolition based on blasting load[D].Beijing:Beijing Institute of Technology,2016.
[2]徐长琦.高层建筑爆破中爆破与塌落振动对比分析[J].广东建材,2018(9):64-67.
[3]季杉,谢伟平,王礼.爆破振动与塌落触地振动特点及传播规律试验研究[J].振动与冲击,2018,37(11):195-201.
JI S,XIE W P,WANG L.Tests for ground vibration cha-racteristics and propagation laws due to blasting and touchdown impact[J].Journal of Vibration and Shock,2018,37(11):195-201.
[4]许名标.高耸构筑物爆破拆除触地振动试验研究[J].工程爆破,2015,21(2):30-35.
XU M B.Experimental study on blasting demolition touchdown vibration of the towering structure[J].Engineering Blasting,2015,21(2):30-35.
[5]黄小武.建(构)筑物爆破拆除塌落触地振动对地铁管片结构的影响研究[D].武汉:武汉科技大学,2015.
HUANG X W.Study on the influence of subway segments structure under impact vibration induced by collapse of building in demolition blasting[D]. Wuhan:Wuhan University of Science and Technology,2015.
[6]叶晓华,苏海军.立式石灰窑定向爆破拆除[J].爆破,2008,25(3):81-83.
YE X H,SU H J.Directional blasting demolition of vertical limekiln[J].Blasting,2008,25(3):81-83.
[7]王迪安.79 m高烟囱拆除爆破振动与塌落触地振动对比分析[J].工程爆破,2006,12(1):86-89.
WANG D A.Comparison between blasting vibration and touchdown vibration in demolishing collapse of a 79 m high chimney[J].Engineering Blasting,2006,12(1):86-89.
[8]周家汉.爆破拆除塌落振动速度计算公式的讨论[J].工程爆破,2009,15(1):1-4,40.
?ZHOU J H.Discussion on calculation formula of collapsing vibration velocity caused by blasting demolition[J].Engineering Blasting,2009,15(1):1-4,40.
[9]刘铭.爆破拆除建筑物塌落与触地振动响应分析[D].武汉:武汉理工大学,2014.
LIU M.Analysis of buildings collapsing by blasting demolition and touchdown vibration response[D]. Wuhan:Wuhan University of Technology,2014.
相似文献/References:
[1]赵坤,蒋昭镳.爆破拆除不同结构钢筋混凝土基础[J].爆破器材,2010,39(02):38.
ZHAO Kun,JIANG Zhaobiao.Demolition Blasting of Different Structure Reinforced Concrete Foundation[J].EXPLOSIVE MATERIALS,2010,39(05):38.
[2]夏卫国,武双章,史常猛.华能莱芜发电厂5座冷却塔爆破拆除[J].爆破器材,2011,40(01):38.
XIA Weiguo WU ShuangzhangSHI Changmeng.Blasting Demolishing of the Five Hyperbolic Cooling Towers for Huaneng Power Plant in Laiwu[J].EXPLOSIVE MATERIALS,2011,40(05):38.
[3]夏卫国,史长猛,武双章,等.谏壁电厂三座100m高钢筋混凝土烟囱爆破拆除[J].爆破器材,2011,40(02):36.
XIA Weiguo,SHI Changmeng,WU Shuangzhang,et al.Demolition of the Three 100 mhigh Reinforced Concrete Chimneys of Jianbi Power Plant by Directional Blasting[J].EXPLOSIVE MATERIALS,2011,40(05):36.
[4]武双章,夏卫国,王德荣,等.2座150 m高钢筋混凝土烟囱爆破拆除应变分析[J].爆破器材,2011,40(06):37.
WU Shuangzhang,XIA Weiguo,WANG Derong,et al.Strain Analysis in Blasting Demolition of Two 150 mhigh Reinforced Concrete Chimneys[J].EXPLOSIVE MATERIALS,2011,40(05):37.
[5]闫鸿浩,刘智远,李晓杰.烟囱爆破拆除及其振动测试分析[J].爆破器材,2013,42(03):21.[doi:10.3969/j.issn.1001-8352.2013.03.005]
YAN Honghao,LIU Zhiyuan,LI Xiaojie.Chimney Blasting Demolition and Analysis of Vibration Measurement[J].EXPLOSIVE MATERIALS,2013,42(05):21.[doi:10.3969/j.issn.1001-8352.2013.03.005]
[6]李清,杨阳,杨仁树,等.基于MAT96本构模型的钢筋混凝土结构爆破拆除数值模拟[J].爆破器材,2015,44(01):41.[doi:10.3969/j.issn.1001-8352.2015.01.010]
LI Qing,YANG Yang,YANG Renshu,et al.The Numerical Simulation of Reinforced Concrete Structure Blasting Based on MAT96 Constitutive Model[J].EXPLOSIVE MATERIALS,2015,44(05):41.[doi:10.3969/j.issn.1001-8352.2015.01.010]
[7]杨建军,黄磊,蔡伟.非对称钢筋混凝土框架结构楼房爆破拆除[J].爆破器材,2015,44(04):51.[doi:10.3969/j.issn.1001-8352.2015.04.012]
YANG Jianjun,HUANG Lei,CAI Wei.Blasting Demolition of a Asymmetrical Building with a Reinforced Concreted Structure[J].EXPLOSIVE MATERIALS,2015,44(05):51.[doi:10.3969/j.issn.1001-8352.2015.04.012]
[8]杨仕教①,张文龙①②,郑建礼②.复杂环境下3座塔形框架结构景观房的控制爆破拆除[J].爆破器材,2016,45(01):51.[doi:10.3969/j.issn.1001-8352.2016.01.012]
YANG Shijiao,ZHANG Wenlong,ZHENG Jianli.Controlled Balsting Demolition of Three Landscape Rooms with Turriform Frame Construction in Complicated Environment[J].EXPLOSIVE MATERIALS,2016,45(05):51.[doi:10.3969/j.issn.1001-8352.2016.01.012]
[9]彭泽森①,倪迪②,陶小钧②,等.隧道扩挖既有衬砌的爆破拆除[J].爆破器材,2019,48(06):48.[doi:10.3969/j.issn.1001-8352.2019.06.010]
PENG Zesen,NI Di,TAO Xiaojun,et al.Blasting Demolition of Existing Lining in Tunnel Expansion Excavation[J].EXPLOSIVE MATERIALS,2019,48(05):48.[doi:10.3969/j.issn.1001-8352.2019.06.010]
[10]高文乐①,朱茂迅①,李元振①,等.发电厂双曲线型冷却塔的定向爆破拆除及爆破效果数值分析[J].爆破器材,2020,49(04):52.[doi:10.3969/j.issn.1001-8352.2020.04.009]
GAO Wenle,ZHU Maoxun,LI Yuanzhen,et al.Directional Blasting Demolition of Hyperbolic Cooling Tower in Power Plant and Numerical Analysis of Blasting Outcome[J].EXPLOSIVE MATERIALS,2020,49(05):52.[doi:10.3969/j.issn.1001-8352.2020.04.009]