参考文献/References:
[1]贾永胜,谢先启,罗启军,等. 69.8m高冷却塔定向爆破拆除.[J]. 工程爆破,2010,16(1):59-62.
Jia Yongsheng,Xie Xianqi,Luo Qijun,et al. Directional blasting demolition of a 69.8m high cooling tower [J].Engineering Blasting, 2010, 16(1):59-62.
[2]杨朴,白立刚.高大薄壁双曲钢筋混凝土冷却塔定向爆破拆除技术[J].铁道工程学报,2006(3):66-69.
Yang Pu, Bai Ligang. Technique for demolishing high thinwall hyperbolic reinforced concrete cool tower by directional blasting [J].Journal of Railway Engineering Society. 2006(3):66-69.
[3]王汉军,杨仁树,李 清.薄壁结构双曲线冷却塔的定向爆破拆除技术[J].煤炭科学技术,2006,34(7):36-40.
Wang Hanjun, Yang Renshu, Li Qing. Directional blasting technology for hyperbola shell structure cooling tower[J].Coal Science and Technology, 2006,34(7):36-40.
[4]黄小广,褚怀保,盖四海,等.复杂条件下85m高钢筋混凝土冷却塔控制爆破拆除[J].工程爆破,2007,13(3) : 50-52.
Huang Xiaoguang, Chu Huaibao, Gai Sihai, et al. Demolition of an 85m high reinforced concrete cooling tower by controlled blasting[J].Engineering Blasting, 2007,13( 3) : 50-52.
[5]陈德志,游力克,丁帮勤,等. 2座90m高冷却塔与150m高烟囱一次性爆破拆除[J].爆破,2012, 29(4):83-86.
Chen Dezhi, You Like, Ding Bangqin, et al. Simultaneously explosive demolition of two 90 m high cooling towers and a 150m high chimney [J]. Blasting, 2012, 29(4):83-86.
[6]夏卫国,武双章,唐勇. 2座110m高双曲线冷却塔爆破拆除[J].爆破,2011,28(2):68-71.
Xia Weiguo, Wu Shuangzhang, Tang Yong. Explosive demolition of two 110 m hyperbolic cooling towers[J].Blasting,2011,28(2):68-71.
[7]吴剑锋.双曲线型冷却塔爆破拆除切口参数研究[J].爆破,2009,26( 1):65-68.
Wu Jianfeng. Research on cut parameters for blasting demolition of hyperbolic cooling tower [J].Blasting, 2009,26(1):65-68.
[8]瞿家林,徐刚,年鑫哲. 电厂内复杂环境下两座90m高冷却塔爆破拆除[J].工程爆破,2011,17( 1) : 65-81.
Qu Jialin, Xu Gang. Nian Xinzhe. Blasting demolition of two 90m high cooling towers under complex environment in the power plan[J]. Engineering Blasting,2011,17( 1) : 65-81.
[9]乐 松,池恩安. 复杂环境下的冷却塔控制爆破拆除[J].爆破,2009,26(2):48-52.
Yue Song, Chi En-an, Controlled blasting demolition of cooling tower in complicated surroundings [J].Blasting, 2009,26(2):48-52.
[10]周家汉. 爆破拆除塌落振动速度计算公式的讨论[J].工程爆破,2009,15( 1) : 1-4,40.
Zhou Jiahan.Discussion on calculation formula of collapsing vibration velocily caused by blasting demolition[J]. Engineering Blasting,2009,15( 1) : 1-4,40.
相似文献/References:
[1]沈彤,徐全军,孔福利,等.危桥控制爆破拆除实践[J].爆破器材,2009,38(02):35.
SHEN Tong,XU Quanjun,KONG Fuli,et al.Demolition of Bridge-beam by Controlled Blasting[J].EXPLOSIVE MATERIALS,2009,38(03):35.
[2]周向阳①,徐全军②,邹锐③,等.城市高架桥控制爆破飞散物防护技术研究与实践[J].爆破器材,2012,41(06):34.[doi:10.3969/J.ISSN.1001-8532.2012.06.010]
ZHOU Xiangyang,XU Quanjun,ZOU Rui,et al.Research and Practice on Fly Rock Defense Technology of Urban Viaducts Controlled Blasting[J].EXPLOSIVE MATERIALS,2012,41(03):34.[doi:10.3969/J.ISSN.1001-8532.2012.06.010]
[3]戴俊,吴丙权,孟振.切缝药包控制爆破初始裂缝形成分析[J].爆破器材,2013,42(03):49.[doi:10.3969/j.issn.1001-8352.2013.03.012]
DAI Jun,WU Bingquan,MENG Zhen.Analysis on Formation of Initial Cracks in Cutting Seam Cartridge due to Controlled Blasting[J].EXPLOSIVE MATERIALS,2013,42(03):49.[doi:10.3969/j.issn.1001-8352.2013.03.012]
[4]齐世福,刘好全,李宾利,等.框剪结构高楼纵向倾倒拆除爆破研究[J].爆破器材,2014,43(03):41.[doi:10.3969/j.issn.1001-8352.2014.03.010]
QI Shifu,LIU Haoquan,LI Binli,et al.Blasting Study on the Lengthwise Collapse of a Tall Building with a Frame Shear Wall Structure[J].EXPLOSIVE MATERIALS,2014,43(03):41.[doi:10.3969/j.issn.1001-8352.2014.03.010]
[5]夏卫国①,袁平①②,武双章①,等.复杂环境下两座烟囱交叉定向爆破拆除[J].爆破器材,2015,44(01):50.[doi:10.3969/j.issn.1001-8352.2015.01.012]
XIA Weiguo,YUAN Ping,WU Shuangzhang,et al.Crossed Directional Blasting of Two Chimneys under Complex Surroundings[J].EXPLOSIVE MATERIALS,2015,44(03):50.[doi:10.3969/j.issn.1001-8352.2015.01.012]
[6]胡葵.城镇闹市区地铁车站基坑的控制爆破[J].爆破器材,2016,45(06):51.[doi:10.3969/j.issn.1001-8352.2016.06.010]
HU Kui.Controlled Blasting of Foundation Pit at Subway Station in Downtown Area[J].EXPLOSIVE MATERIALS,2016,45(03):51.[doi:10.3969/j.issn.1001-8352.2016.06.010]
[7]姚显春①②,姚尧①②,寄科祥②,等.城市复杂环境下90 m钢筋砼烟囱的定向爆破拆除[J].爆破器材,2017,46(06):53.[doi:10.3969/j.issn.1001-8352.2017.06.011]
YAO Xianchun,YAO Yao,JI Kexiang,et al.Directional Blasting Demolition of a 90m-high Steel-concrete Chimney in Urban Complex Environment[J].EXPLOSIVE MATERIALS,2017,46(03):53.[doi:10.3969/j.issn.1001-8352.2017.06.011]
[8]孙飞①,郭文华②,顾云①,等.矮胖式筒仓集群爆破切口参数设计及预处理技术[J].爆破器材,2021,50(01):59.[doi:10.3969/j.issn.1001-8352.2021.01.011]
SUN Fei,GUO Wenhua,GU Yun,et al.Parameters Design of Blasting Cut and Pretreatment Technology of Chunky Silo Cluster[J].EXPLOSIVE MATERIALS,2021,50(03):59.[doi:10.3969/j.issn.1001-8352.2021.01.011]
[9]黄磊,唐勇,杨建军.大曲率非对称匝道桥爆破拆除[J].爆破器材,2021,50(04):60.[doi:10.3969/j.issn.1001-8352.2021.04.011]
HUANG Lei,TANG Yong,YANG Jianjun.Explosive Demolition of an Asymmetric Ramp Bridge with Large Curvature[J].EXPLOSIVE MATERIALS,2021,50(03):60.[doi:10.3969/j.issn.1001-8352.2021.04.011]
[10]王静①,薛永利①,丁建②③,等.岩石控界切割锥形聚能射流的优化设计及试验[J].爆破器材,2023,52(03):52.[doi:10.3969/j.issn.1001-8352.2023.03.008]
WANG Jing,XUE Yongli,DING Jian,et al.Optimal Design and Test of Conical Shaped Charge for Rock Boundary Control Cutting[J].EXPLOSIVE MATERIALS,2023,52(03):52.[doi:10.3969/j.issn.1001-8352.2023.03.008]