相似文献/References:
[1]路亮,龙源,谢全民,等.高层楼房爆破塌落振动对周边目标影响的测试与分析[J].爆破器材,2010,39(02):1.
LU Liang,LONG Yuan,XIE Quanmin,et al.Influence Test and Analysis of Collapse Vibration of High-building Demolition Blasting on Surroundings[J].EXPLOSIVE MATERIALS,2010,39(01):1.
[2]张志呈,熊文,吝曼卿.露天矿逐孔爆破技术的应用及效果[J].爆破器材,2010,39(06):17.
ZHANG Zhicheng,XIONG Wen,LIN Manqing.Application and Effect of Hole by Hole Initiating Blasting in Open-pit Mining[J].EXPLOSIVE MATERIALS,2010,39(01):17.
[3]张志呈,姚勇,龙林.钢筋混凝土框架后排立柱底端不装药爆破拆除效果分析[J].爆破器材,2009,38(06):26.
ZHANG Zhicheng,YAO Yong,LONG Lin.Analysis on Blasting Demolition of RC Frame Structure with Back Columns Notblasted[J].EXPLOSIVE MATERIALS,2009,38(01):26.
[4]李兴华,龙源,钟明寿,等.哈尔滨龙海大厦拆除爆破中的减振技术研究[J].爆破器材,2009,38(06):30.
LI Xinghua,LONG Yuan,ZHONG Mingshou,et al.Study on Technology of Vibration Reduction in Demolition Blasting of LongHai Mansion in Haerbin[J].EXPLOSIVE MATERIALS,2009,38(01):30.
[5]毛益松①,王升②,单志国②,等.深孔爆破技术在板肋石拱桥爆破拆除中的应用[J].爆破器材,2013,42(01):35.[doi:10.3969/j.issn.1001-8352.2013.01.010]
MAO Yisong,WANG Sheng,SAN Zhiguo,et al.The Application of Deephole Blasting Technology in the Blasting Demolition of Ribbed Slab Stone Arch Bridge[J].EXPLOSIVE MATERIALS,2013,42(01):35.[doi:10.3969/j.issn.1001-8352.2013.01.010]
[6]吴久荣①,张志呈②,肖定军②,等.定向爆破拆除偏斜烟囱[J].爆破器材,2008,37(05):30.
Wu Jiurong,Zhang Zhicheng,Xiao Dingjun,et al.Demolition of a Leaning Brick-structural Chimney by Directional Blasting[J].EXPLOSIVE MATERIALS,2008,37(01):30.
[7]吴久荣①,张志呈②,肖定军②,等.机立窑生产线定向拆除爆破[J].爆破器材,2008,37(04):21.
Wu Jiurong,Zhang Zhicheng,Xiao Dingjun,et al.Demolition of the Mechanized Shaft Kiln by Directional Blasting[J].EXPLOSIVE MATERIALS,2008,37(01):21.
[8]梁书锋①,王建国②,李鹏飞③,等.40 m青砖烟囱定向控制爆破拆除技术[J].爆破器材,2018,47(04):60.[doi:10.3969/j.issn.1001-8352.2018.04.011]
LIANG Shufeng,WANG Jianguo,LI Pengfei,et al.Demolition of a 40 m-high Black Brick Chimney by Directional Controlled Blasting[J].EXPLOSIVE MATERIALS,2018,47(01):60.[doi:10.3969/j.issn.1001-8352.2018.04.011]
[9]姚显春①,姚尧①②,张伟②,等.高层框-剪结构建筑的定向爆破拆除[J].爆破器材,2019,48(03):49.[doi:10.3969/j.issn.1001-8352.2019.03.010]
YAO Xianchun,YAO Yao,ZHANG wei,et al.Directional Blasting Demolition of a High Rise Buiding with a Frame-shear Structure[J].EXPLOSIVE MATERIALS,2019,48(01):49.[doi:10.3969/j.issn.1001-8352.2019.03.010]
[10]高文乐①,赵德龙①,李元振①,等.延期时差对多截面承重立柱框架结构拆除爆破效果的影响[J].爆破器材,2021,50(02):50.[doi:10.3969/j.issn.1001-8352.2021.02.010]
GAO Wenle,ZHAO Delong,LI Yuanzhen,et al.Influence of Delayed Time Difference on Demolition Blasting Effect of Multi-Section Load-Bearing Column Frame Structure[J].EXPLOSIVE MATERIALS,2021,50(01):50.[doi:10.3969/j.issn.1001-8352.2021.02.010]